A9/AP Factory Extension, Unilever, Leeds

A9/AP Factory Extension, Unilever, LeedsClient – Unilever UK Ltd

Contract Administrator – Unilever UK Ltd

Value – £6581k

Construction Period – 8 months

Factory in operation during the Works.

 Phase Extension to the existing Factory including foundations, steel frame, roof & wall cladding, Steel handrails to Roof, Steel Staircases and alterations to the existing.

 The works also included forming 80m2 of Office space, extending the existing concrete floor laid to falls and incorporating Heavy Duty Channel and Grating, and anti-static resin floor finish.

Forming reinforced concrete bunded area for Tanks.